9 bore milling (cycle 208, software option 19), Cycle run, Bore milling (cycle 208, software option 19) – HEIDENHAIN TNC 620 (34056x-04) Cycle programming User Manual
Page 84
Fixed Cycles: Drilling
3.9
BORE MILLING (Cycle 208, software option 19)
3
84
TNC 620 | User's Manual Cycle Programming | 5/2013
3.9
BORE MILLING (Cycle 208, software
option 19)
Cycle run
1 The TNC positions the tool in the tool axis at rapid traverse
FMAX to the programmed set-up clearance above the workpiece
surface and then moves the tool to the bore hole circumference
on a rounded arc (if enough space is available).
2 The tool mills in a helix from the current position to the first
plunging depth at the programmed feed rate
F.
3 When the drilling depth is reached, the TNC once again
traverses a full circle to remove the material remaining after the
initial plunge.
4 The TNC then positions the tool at the center of the hole again.
5 Finally the TNC returns to the setup clearance at
FMAX. If
programmed, the tool moves to the 2nd set-up clearance at
FMAX.