1 installing the board – Artesyn Centellis 4410 (AXP-1410) Installation and Use (July 2014) User Manual
Page 91

FRU Installation
AXP 1410 Installation and Use (6806800H70L)
91
4.2.1
Installing the Board
To install the board into an AdvancedTCA shelf, proceed as follows.
Installation Procedure
The following procedure describes the installation of the board. It assumes that your system is
powered. If your system is unpowered, you can disregard the blue LED and thus skip the
respective step. In this case it is a purely mechanical installation.
1. Put on an ESD wrist strap.
2. Connect the strap to the shelf by attaching the front or rear ESD jack.
3. Set the rotary switches according to your needs. For more information, refer to
.
4. Insert the module into the shelf by placing the top and bottom edges of the board
in the card guides of the shelf. Ensure that the guiding module of shelf and board
are aligned properly. The alignment pin facilitates the insertion and prevents bent
pins.
5. Slide the module into the shelf.
6. Rotate the ejector handle upward until it snaps into place.
7. Wait until the blue LED is illuminated.
8. Screw in the captive screw hand tight.
The blue LED blinks.
9. Wait until the blue LED is switched OFF.
The switched off blue LED indicates that the board is activated.
If the shelf contains only one shelf manager board you have to power down the shelf before
exchanging the board.