beautypg.com

System installation, 1 overview, 2 before installation – Artesyn Centellis 4410 (AXP-1410) Installation and Use (July 2014) User Manual

Page 73: 1 requirements, 1 overview 3.2 before installation, Chapter 3

background image

Chapter 3

AXP 1410 Installation and Use (6806800H70L)

73

System Installation

3.1

Overview

The following sections help you to start up and maintain the system:

3.2

Before Installation

This section provides the following information:

Type label location

Requirements

Tools you will need

3.2.1

Requirements

The power input cables must have a minimum cross section of 21 mm

2

, AWG 4.

Section

Description

Before installation

This section provides information about the requirements, unpacking and
inspecting the delivery and the type label location.

Installation

This section provides information about how to mount the system into a rack
and how to ground the system.

Removal

This section provides information on how to power down the system and
remove it from a rack.

This manual is related to the following products: