beautypg.com

Site preparation, 1 overview, 2 site planning considerations – Artesyn Centellis 4410 (AXP-1410) Installation and Use (July 2014) User Manual

Page 63: 1 receiving and unpacking the system, 1 overview 2.2 site planning considerations, Chapter 2

background image

Chapter 2

AXP 1410 Installation and Use (6806800H70L)

63

Site Preparation

2.1

Overview

The following sections help you to prepare system installation:

2.2

Site Planning Considerations

This section provides information to prepare the site and the shelf for installation.

2.2.1

Receiving and Unpacking the System

Shipment Inspection

To inspect the shipment perform the following steps:

1. Verify that you have received all items of your shipment.

Compare the shipment thoroughly with the delivery note.

2. Visually inspect the shelf to ensure that all of the connector pins are straight,

shrouds are properly seated, screws are tight, etc.

Section

Gives Information On

Site Planning Considerations

This section includes information on unpacking and
inspecting the system, requirements, technical data, and
other information you need to know before you start
system installation.

Site Planning Checklists

This section provides checklists for site preparation.

Damage of Circuits
Electrostatic discharge and incorrect module installation and removal can damage circuits
or shorten their life.
Before touching the module or electronic components, make sure that you are working in
an ESD-safe environment.

This manual is related to the following products: