0 commissioning and startup, 1 general, 2 checklist prior to startup – Reznor RECC Unit Installation Manual User Manual
Page 64: 0 optional equipment (cont'd)

Form I-MAPSIII&IV, Page 64
Electric Heat Capacity and Sequence of Operation - Cabinet Sizes A, B, C
NOTE: 575V & 600V apply to RECB & RECC only.
Electric Heat Capacity Table
Size
240/480/600V
208V
230/460/575V
KW
MBH
KW
MBH
KW
MBH
10S
10
34.1
7.5
25.6
9.2
31.4
15S
15
51.2
11.3
38.4
13.8
47.1
20S
20
68.3
15.0
51.2
18.4
62.8
24S
24
82.0
18.0
61.5
22.1
75.4
15
15
51.2
11.3
38.4
13.8
47.1
20
20
68.3
15.0
51.2
18.4
62.8
25
25
85.4
18.8
64.0
23.0
78.5
30
30
102.5
22.5
76.8
27.6
94.3
35
35
119.5
26.3
89.6
32.2
110.0
39
39
133.2
29.3
99.9
35.9
122.5
60
60
204.9
45.0
153.7
55.2
188.5
75
75
256.1
56.3
192.1
69.0
235.6
88
88
300.5
66.0
225.4
81.0
276.5
Size
(kW) Size Cabinet
Electric Heaters Sequence of Operation
Stage
1
Stage
2
Stage 3
Stage 4
10
10S
A
10
-
-
-
15
15S
A
15
-
-
-
20
20S
A
20
-
-
-
24
24S
A
24
-
-
-
15
15
A or B
5
10
5 + 10
-
20
20
A or B
5
15
5 + 15
-
25
25
A or B
10
15
10 + 15
-
30
30
A or B
10
20
10 + 20
-
35
35
A or B
15
20
15 + 20
-
39
39
A, B, or C
15
24
15 + 24
-
50
50
B or C
10
10+10 10+10+15 10+10+15+15
60
60
B or C
10
10+10 10+10+20 10+10+20+20
75
75
B or C
15
15+20 15+20+20 15+20+20+20
88
88
B or C
20
20+20 20+20+24 20+20+24+24
9.0 Optional Equipment (cont'd)
9.3 lectric Heat - Models RECB, REDB, RECC, REDC (cont'd)
Modulating heating operation is controlled by an SCR modulating control. There will be
one or two SCR controllers located on an electrical panel in the electric heat section.
WARNING
The heatsink on the SCR power controller is hot to the touch.
FIGURE 47 - SCR
Controller for Electric
Heat Modulation
DANGER
High voltages are present on the terminals of the SCR power
controller(s).
9.3.2 Modulating Electric Heat
10.2 Checklist Prior
to Startup
Assumptions: All connections are made; actual startup is imminent. Site is clean; all
excess supplies, scraps, and debris have been removed. Clean filters are in place.
Doors are open for checks.
WARNING
To prevent injury or death due to electrocution or contact with
moving parts, lock disconnect switch open when doing checks
prior to startup.
NOTE: Redo cooling
startup procedures
when the cooling
season begins.
10.2.1 All Systems Checklist Prior to Startup:
Check clearances. All clearances must be as illustrated in Paragraph 4.1.
Verify the electrical supply matches voltage rating of the unit. (Refer to the rating
plate.)
10.1 General
Follow the procedures listed in Paragraphs 10.2 - 10.4 and fill in the Startup Form in
the
APPENDIX, page 70.
10.0 Commissioning and Startup
- REDB Unit Installation Manual RECB Unit Installation Manual RDDC Unit Installation Manual RDCC Unit Installation Manual RDDB Unit Installation Manual RDCB Unit Installation Manual RDC Unit Installation Manual RCC Unit Installation Manual RDB Unit Installation Manual RCB Unit Installation Manual REDC Unit Installation Manual MAPSIV Unit Installation Manual MAPSIII Unit Installation Manual