6. Before placing the MAPS

®

unit or energy recovery module on the curb:

If ductwork is being installed from the top, slide the ductwork down into the discharge and return air openings.

Ductwork should be sized slightly smaller with a minimum 3/4" duct flange that will rest on and be attached to all

sides of the duct connection. See Paragraph 6.4 for ductwork requirements.

Apply 1/4" x 1-1/4" foam sealant tape to both the top surface of the curb rails and the top surface of the perimeter of

the integral dividers, being sure to make good butt joints at all corners. The sealant tape must be applied to prevent

water leakage into the curb area due to blown rain and capillary action.

7. Lift the MAPS

®

unit on to the prepared curb (See Rigging and Lifting in Paragraph 5.5).

IMPORTANT: Verify that the

unit will be placed in the correct airflow orientation to mate properly with the discharge and return air openings.

8. After the MAPS

®

unit is in place, follow the instructions shipped with the energy recovery module

(Form I-MAPSIII&IV-ER) to lift and mate the energy recovery module to the MAPS

®

unit.

14”

(356mm)

1-7/8”(48mm)

(102mm)

2 x 4 Wood

Nailer

1-1/2 x 3 lb

Fiberglass

Flashed by the

installer (flashing

must be under lip

of curb)

Lag Screw

Cap

Screws

Curb Detail

Corner Detail

Curb Section

FIGURE 8B - Option

CJ34 Downflow Roof

Curb Cross Section and

Corner Detail

MUST be sealed

between curb cap

and top of curb

Cabinet

2x4 Wood Nailer

Counter Flashing

(by installer)

Cant Strip

(by installer)

Weld, bolt, or lag screw curb to deck structure.

Roofing Felts

(by others)

Insulation

2. Assemble the Energy Recovery Curb Section

a) Position the sides (

Codes L and M

) as shown in the drawing in

FIGURE 8A.

Attach the sides to the assembled curb section with sheetmetal screws.

b) Attach the curb end (

Code A

). Fasten with bolts and lag screws as illustrated in

the corner detail (

FIGURE 8B) .

c) Position the tunnel (

Code K

) over the opening in the center. Attach with

sheetmetal screws.

3. Check the roof curb for squareness. The curb must be adjusted so that the

diagonal measurements are equal within a tolerance of ±1/8” (±3mm).

4. Level the roof curb. To ensure a good weatherproof seal between the unit curb cap

and the roof curb, the roof curb must be leveled in both directions with no twist end

to end. Shim as required and secure curb to the roof deck before installing flashing

(See Curb Detail in

FIGURE 8B).

5. Install field-supplied flashing.

FIGURE 8C - Curb Dimensions of Option CJ34 for a MAPS

®

unit with

Option ER1

Curb Section for

Energy Recovery

Module

Curb Section for MAPS® Unit (Cabinet A, B, or C)

Supply

Air Duct

Connection Size Same as CxD on pages 4 and 5.

Return

Air Duct Connection

Size Same as ExF on pages 4 and 5.

Duct Dimensions for

the MAPS® unit are

the same as without

the Energy Recovery

Module.

See dimensions

A, B, C, D, E, F, H, J,

K, M on pages 4-5.

TOP VIEW - Option CJ34 Roof Curb for MAPS® Cabinet Sizes* A, B, or C with Option ER1, Energy Recovery Module

X

Y

* See pages

71-72

for cross-

reference by

Cabinet &

Model.

Dimensions and

Weights

See Table on

next page

for X and Y

Dimensions.