Ice build control – Carrier 19XL User Manual

Page 105

background image

Ice Build Control

Ice build control automatically sets the chilled WATER/ BRINE CONTROL POINT of the

machine to a temperature where an ice building operation for thermal storage can be

accomplished.

Note: For ice build control to properly operate, the PIC controls must be placed in CCN mode.

See

Figure 16

and

Figure 17

.

The PIC can be configured for ice build operation. Configuration of ice build control is

accomplished through entries in the Config table, Ice Build Setpoint table, and the Ice Build

Time Schedule table.

Figure 16

and

Figure 17

show how to access each entry.

The Ice Build Time Schedule defines the period during which ice build is active if the ice build

option is ENABLED. If the Ice Build Time Schedule overlaps other schedules defining time, then

the Ice Build Time Schedule shall take priority. During the ice build period, the WATER/BRINE

CONTROL POINT is set to the ICE BUILD SETPOINT for temperature control. The ICE BUILD

RECYCLE OPTION and ICE BUILD TERMINATION entries from a screen in the Config

(configuration) table provide options for machine recycle and termination of ice build cycle,

respectively. Termination of ice build can result from the ENTERING CHILLED WATER/BRINE

IMPORTANT: The Ice Build control option is only available on machines with PSIO

Software Version 09 and higher.