beautypg.com

Inspect water piping, Check optional pumpout compressor water piping – Carrier 19XL User Manual

Page 136

background image

Inspect Water Piping

Refer to piping diagrams provided in the certified drawings, and the piping instructions in the

19XL Installation Instructions manual. Inspect the piping to the cooler and condenser. Be sure

that flow directions are correct and that all piping specifications have been met.

Piping systems must be properly vented, with no stress on waterbox nozzles and covers.

Water flows through the cooler and condenser must meet job requirements. Measure the

pressure drop across cooler and across condenser.

Check Optional Pumpout Compressor Water Piping

If the optional storage tank and/or pumpout system are installed, check to ensure the

pumpout condenser water has been piped in. Check for field-supplied shutoff valves and

controls as specified in the job data. Check for refrigerant leaks on field-installed piping. See

Figure 27

and

Figure 28

.

CAUTION

CAUTION

!

Water must be within design limits, clean, and treated to ensure proper machine
performance and reduce the potential of tubing damage due to corrosion, scal-
ing, or erosion. Carrier assumes no responsibility for chiller damage resulting
from untreated or improperly treated water.