6. Mount the new module in the unit control box using a long-shaft Phillips screwdriver and the

screw saved in Step 4 above. Make sure that the green grounding wire is reinstalled along

with the mounting screw.

7. Connect the LID communication wires (CCN bus) and the power wires. If CCN wiring has

been attached to the CCN bus, disconnect the wires. Attach the sensor bus plug and the

input and output plugs.

8. Carefully check all wiring connections before restoring power.

9. Restore control power and verify that the red and green LEDs on the PSIO are functioning

properly.

10. Access the Attach to Network Device table on the LID Service menu. Set the local device

address to Bus 0, Address 90. Press the ATTACH softkey to upload the PSIO into the LID.

11. Change the address of the PSIO in the Controller Identification table back to the previous

value. Write the address on the PSIO.

12. Use the configuration sheets to input setpoint, configuration, and schedule information into

the PSIO. The Time and Date table also must be set. A Building Supervisor can be used to

download, the old configuration into the PSIO.

13. Perform a Control Test and verify all tests.

If the software version has been updated, a CCN download of the configuration will not be

allowed. Configure the PSIO by hand, and upload the PSIO into the network by using the

Attach to Network Device table.