Carrier 30HS User Manual
30hr,hs, Reciprocating liquid chillers, Wiring diagrams
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Number One
AirConditbning
Maker
m
e
n of Carrier Corporation
Syracuse New York
Wiring Diagrams
30HR,HS
070 iJ»ru
tm
Reciprocating Liquid Chillers
60-Hertz
These diagrams apply to 30HR,HS070—120 Model A units starting
with Serial No. FI 55985 and ending with Serial No. G448588.
INDEX
UNIT
30HR,HS
070
thru
120
070,
080,
090
100
,
no,
120
FIGURE
NUMBER
DESCRIPTION
Wi ri rig For
Part-Winding Start
Suggested Field
Wiring Interlocks
’ ~T_ocdtTons o?
Control Components
Power Schernatic
Control CTrcu i t
{Simplified Schematic)
CornfroTTr i rcuit
(Simplified Schematic)
Power Schematic
'Locations of
Control Components
VOLTS
All
All
208
,
230
,
460,575
208
,
230
,
460,575
UNIT LABEL DIAGRAM
30HR
All
080-1214
080-1224
100-1584
100-1594
Re
Same As
Below
GENERAL NOTES
1.
Factory wiring is in accordance with the
National Electrical Code. Any field modifica
tions or additions must be in compliance with
all applicable codes. Field-installed power wires
must be rated 75 C minimum.
2. Control circuit is 115-1-60, with 10-amp circuit
breaker.
3. Oil pressure safety switches are standard on
30HS units only. Jumpers between terminals] 1 |
and
and between
and
are supplied on
30HR units.
4. Manual transfer switch provides the following
starting sequences:
Three-compressor units — position 1 (terminal
A), 3-2-1; position 2 (terminal B), 1-2-3.
Four-compressor units ~ position 1 (terminal
A), 1-4-3-2; position 2 (terminal B), 3-2-1-4.
Stop unit before changing transfer switch
position.
5. All field-supplied auxiliary contacts must have a
minimum rating of 1250-va inrush and 430-va
sealed plus capacity required for field-installed
equipment between terminals 111 [ and
andpT],] 5 [and
and
12
10
6. With accessory .75-kva control transformer,
additional controls up to 3800-va inrush and
175-va sealed may be used.
7.
8
.
9.
When using a transformer, ground control
circuit by connecting green wire from trans
former terminal X2 to ground screw (detailed
instructions with transformer package).
When using field-supplied 115-volt control
(L2) must be connected to
24
power, terminal
neutral or ground potential.
Across-the-line starting is standard on all units.
If it is necessary to modify to part-winding
start, refer to “Modification For Part-Winding
Start.”
© Carrier Corporation 1971
475
Form 30HR,HS-7W