Operation, Operator’s manual, Pre-operating checklist – Great Plains DICKEY-john AI-120 12-inch Virtual Terminal User Manual
Page 157

OPERATOR’S MANUAL
AI-120 Virtual Terminal
11001-1606B-201310
OPERATION / 149
OPERATION
PRE-OPERATING CHECKLIST
Before beginning a job, verify that the following procedures are completed:
•
Variable rate jobs must have variable rate control enabled at the
Settings menu
•
A loaded implement profile must be configured as an automated
section control and a variable rate control implement
•
A solid GPS signal is present
•
All previous job data cleared before starting a new job
TIP: Enable the Quick Start feature or the Job Assist feature at the
Settings/System/Features/Guidance menus to help with stepping
through job setup.
TO BEGIN OPERATING
1. With the implement lowered, press the Master Switch button to
enable coverage mapping. Coverage mapping is active when the
master switch button is green.
2. Drive the vehicle forward. A green bar behind the implement
represents the coverage area.
3. Press the Master Switch button again to disable coverage mapping.
Coverage mapping is disabled when the master switch button is grey.
Figure 213
Coverage Mapping