beautypg.com

Operation, Operator’s manual, Pre-operating checklist – Great Plains DICKEY-john AI-120 12-inch Virtual Terminal User Manual

Page 157

background image

OPERATOR’S MANUAL

AI-120 Virtual Terminal

11001-1606B-201310

OPERATION / 149

OPERATION

PRE-OPERATING CHECKLIST

Before beginning a job, verify that the following procedures are completed:

Variable rate jobs must have variable rate control enabled at the
Settings menu

A loaded implement profile must be configured as an automated
section control and a variable rate control implement

A solid GPS signal is present

All previous job data cleared before starting a new job

TIP: Enable the Quick Start feature or the Job Assist feature at the
Settings/System/Features/Guidance menus to help with stepping
through job setup.

TO BEGIN OPERATING

1. With the implement lowered, press the Master Switch button to

enable coverage mapping. Coverage mapping is active when the
master switch button is green.

2. Drive the vehicle forward. A green bar behind the implement

represents the coverage area.

3. Press the Master Switch button again to disable coverage mapping.

Coverage mapping is disabled when the master switch button is grey.

Figure 213

Coverage Mapping