2 preparations – Metrohm 761 Compact IC User Manual
Page 64
3 Operating tutorial
761 Compact IC
54
3.2 Preparations
Before you start this brief tutorial, the entire IC system must be correctly
installed as described in section 2. In what follows, the most important
points for the installation are described once again (for details, see the
sections mentioned).
1 Install 761 Compact IC
⇒
Setting up instrument
section 2.2
⇒
Installing and connecting detector block
section 2.3.1
⇒
Mounting syringe and aspirating tubing
section 2.3.2
⇒
Mounting drain tubes
section 2.3.3/4
⇒
Mains connection
section 2.4
⇒
Connection to PC
section 2.5
2 Prepare eluent
⇒
Preparing eluent:
2 mmol/L NaHCO
3
/ 1.3 mmol/L Na
2
CO
3
in dist. H
2
O
⇒
Microfiltering and degassing eluent
section 5.1.3
3 Install high-pressure pump
⇒
Removing transport security screws
section 2.6.1
⇒
Mounting pulsation dampener
section 2.6.2
⇒
Installing eluent supply
section 2.6.3
⇒
Degassing pump
section 2.6.4
4 Connecting separating column and suppressor
⇒
Connecting IC anion column
section 2.7.8
⇒
Connecting peristaltic pump
section 2.8.2
⇒
Connecting supply bottles
section 2.8.3
⇒
Connecting suppressor module
section 2.8.4
⇒
Conditioning system
section 2.9.2