Metrohm 761 Compact IC User Manual
Page 39

2.6 High-pressure pump
761 Compact IC
29
2.6.4
Deaerating the pump and rinsing the pulsation dampener
The first time that it is started up the high-pressure pump must be
deaerated. Proceed as follows:
1 Prepare for deaeration
•
Open the rotary knob on purge valve 39 by approx. ½ turn in
the counterclockwise direction (see Fig. 3 and Fig. 4).
•
Remove the plastic stopper from connection 8 on the front
panel of 761 Compact IC (see Fig. 1).
•
Push 6.2816.020 Syringe (without needle) into connection 8
until the stop is reached.
2 Open and connect system
•
Start the «761 Compact IC» PC program, if it has not been
already been started (see section 2.5.3).
•
Select
File / Open / System
in the main window. Open either the
subfolder
Non-suppressed
(for 2.761.0010 Compact IC without
suppressor) or the subfolder
Suppressed
(for 2.761.0020
Compact IC with suppressor). Select the system file
n-01.smt
or
s-01.smt
and click on
. The corresponding system
window is opened:
•
Select the
Connect to workplace
item of the
Control
menu in this
window.
3 Set flow rate to 2 mL/min
•
Double-click the 761 icon in the system window to open the
window for manual control of the 761 Compact IC (see be-
low).
•
Set the flow rate to
2 mL/min
in the
Flow
field.
•
Click to
to send this value to the 761 Compact
IC.