beautypg.com

Preparations, Integrated pe conductor connection, Electrical installation – Lenze i700 Manual User Manual

Page 101

background image

Electrical installation

Preparations

Integrated PE conductor connection

6

l

101

EDS700ACBA EN 4.0

6.5

Preparations

When the mechanical installation has been completed, the electrical wiring starts with the
creation of the integrated electrical connections:

6.5.1

Integrated PE conductor connection

How to proceed:

ƒ

Use the swivel hook to establish the PE conductor connection of the devices.
– Loosen the screws
– Turn the swivel hook into the right position
– Fasten the screws

ƒ

At the left and right device of an installation row, attach the PE connection twice
conforming to standards.

ƒ

Then attach the shield connection sheet.

i700A00x

Terminal data

Conductor cross−section

Tightening torque

!

[mm

2

]

[AWG]

[Nm]

[lb−in]

Swivel hook

+

2.5

22.1

PH 2

i700M00x