beautypg.com

HP XP7 Storage User Manual

Page 320

background image

Message ID

Message Text

Explanation

target HBA port WWN. After that,

specify the appropriate HBA port

WWN, and then retry.

KAPL01102-I

All the paths which pass the

specified aa...aa port will be

changed to the Offline(C)

status. Is this OK? [y/n]:

Details

Multiple paths will be collectively

placed Offline(C) because the -
hbaportwwn parameter was

specified. To collectively place

multiple paths Offline(C), enter y.

To not collectively place them

Offline(C), enter n.
aa...aa: HBA

Action

If you want to execute the offline

processing for the paths which

pass the specified target, enter y.

If you want to terminate the

processing, enter n.

KAPL01103-I

If you are sure that there would

be no problem when all the

paths which pass the specified

aa...aa port are placed in the

Offline(C) status, enter y.

Otherwise, enter n. [y/n]:

Details

This message re-asks the user

whether to place all the paths

Offline(C). To place all the paths

Offline(C), enter y. To not place

them Offline(C), enter n.
aa...aa: HBA

Action

If you want to execute the offline

processing for the paths which

pass the specified target, enter y.

If you want to terminate the

processing, enter n.

KAPL01104-I

All the paths which pass the

specified aa...aa port will be

changed to the Online status. Is

this OK? [y/n]:

Details

Multiple paths will be collectively

placed Online because the -
hbaportwwn parameter was

specified. To collectively place

multiple paths Online, enter y. To

not collectively place them Online,

enter n.
aa...aa: HBA

Action

If you want to execute the online

processing for the paths which

pass the specified target, enter y.

If you want to terminate the

processing, enter n.

KAPL01106-W One or more connected storage

system cannot use the load

balancing function.

Action

None.

8-22

Messages

Hitachi Dynamic Link Manager (for Windows®) User Guide

This manual is related to the following products: