Table C-5 Site Inspection Checklist (continued)

Comment or Date

Please check either Yes or No. If No, include comment# or date

Is power conditioning equipment installed?

18.

Is there a dedicated branch circuit for equipment?

19.

Is the dedicated branch circuit less than 250 feet (72.5 meters)?

20.

Are the input circuit breakers adequate for equipment loads?

21.

Safety

No

Yes

Area or condition

No.

Is there an emergency power shut-off switch?

22.

Is there a telephone available for emergency purposes?

23.

Is there a fire protection system in the computer room?

24.

Is antistatic flooring installed?

25.

Are there any equipment servicing hazards (loose ground wires,
poor lighting, etc.)?

26.

Cooling

No

Yes

Area or condition

No.

Can cooling be maintained between 20 °C and 55 °C (up to 5000
ft.)? Derate 1 °C/1000 ft. above 5000 ft. and up to 10,000 ft.

27.

Can temperature changes be held to 10 °C per hour with tape
media? Can temperature changes be held to 20 °C per hour without
tape media?

28.

Can humidity level be maintained at 40% to 60% at 35 °C
noncondensing?

29.

Are air conditioning filters installed and clean?

30.

Storage

No

Yes

Area or condition

No.

Are cabinets available for tape and disc media?

31.

Is shelving available for documentation?

32.

Training

Area or Condition

No.

Are personnel enrolled in the System Administrator's Course?

33

Is on-site training required?

34

Delivery Survey

The delivery survey forms list delivery or installation requirements. If any of the items on the
list apply, enter the appropriate information in the areas provided on the form.
Special instructions or recommendations should be entered on the special instructions or
recommendations form. The following list gives examples of special instructions or issues:

Packaging restrictions at the facility, such as size and weight limitations

Special delivery procedures

Special equipment required for installation, such as tracking or hoists

Delivery Survey