beautypg.com

Equipment grounding implementation details, System installation guidelines, Wiring connections – HP 9000 rp5400 Servers User Manual

Page 147: Raised floor metal strip ground system

background image

Figure C-1 Raised Floor Metal Strip Ground System

Equipment Grounding Implementation Details

Connect all Hewlett-Packard equipment cabinets to the site ground grid as follows:
1.

Attach one end of each ground strap to the applicable cabinet ground lug.

2.

Attach the other end to the nearest pedestal base (raised floor) or cable trough ground point
(nonraised floor).

3.

Check that the braid contact on each end of the ground strap consists of a terminal and
connection hardware (a 1/4-in. (6.0-mm) bolt, nuts, and washers).

4.

Check that the braid contact connection points are free of paint or other insulating material
and treated with a contact enhancement compound (similar to Burndy Penetrox).

System Installation Guidelines

This section contains information about installation practices. Some common pitfalls are
highlighted. Both power cable and data communications cable installations are discussed.

NOTE:

In domestic installations, the proper receptacles should be installed prior to the arrival

of Hewlett-Packard equipment. Refer to the appropriate installation guide for installation
procedures.

Wiring Connections

Expansion and contraction rates vary among different metals. Therefore, the integrity of an
electrical connection depends on the restraining force applied. Connections that are too tight
compress or deform the hardware and causes it to weaken. This usually leads to high impedance

Electrical Factors

147