beautypg.com

HP Hitachi Dynamic Link Manager Software User Manual

Page 212

background image

Table 6-5 Relationship Between the Setting for the Automatic Failback

Function and Intermittent Error Monitoring and the Executable Operations

Setting

Available operation

Result of operation

AFB

IEM

on

on

Set AFB to on.

The operations of AFB and IEM do not

change.

Change the AFB setting.

AFB is performed under the new
settings.

#1

Set AFB to off.

AFB and IEM are disabled.

The error count, elapsed monitoring

time, and information about paths

not subject to automatic failback are

cleared.

Set IEM to on.

When a path is being monitored

(during a period of conditional

intermittent error monitoring), the

value of the error count and the

elapsed monitoring time are reset to
0, and then intermittent error

monitoring will restart.

When a path is not being monitored,

nothing changes.

Change the IEM settings.

While a path is being monitored, the

value of the error count and the

elapsed monitoring time are reset to

0, and then intermittent error
monitoring will restart.

#1

When a path is not being monitored,

the IEM settings will take effect

again when the path is recovered

from the error status by performing

an automatic failback.

Set IEM to off.

IEM is disabled.

The error count, elapsed monitoring

time, and information about paths

not subject to automatic failbacks

are cleared.

off

Set AFB to on.

The operations of AFB and IEM do not

change.

Change the AFB setting.

AFB operates using new settings.

Set AFB to off.

AFB is disabled.

Set IEM to on.

IEM is enabled.

#1

off

on

#2

Set AFB to on.

AFB and IEM are enabled.

#1

Set AFB to off.

The operations of AFB and IEM do not

change.

6-24

Command Reference

Hitachi Dynamic Link Manager User Guide (for Windows(R))

This manual is related to the following products: