Start-up, 1 start-up checklist, 2 operating concept – KROHNE OPTIFLEX 1300C EN User Manual
Page 61
START-UP
5
61
OPTIFLEX 1300 C
www.krohne.com
03/2014 - 4000172306 - HB OPTIFLEX 1300 R07 en
5.1 Start-up checklist
Check these points before you energize the device:
• Are all the wetted components (probe, process connection and gaskets) chemically resistant
to the product in the tank?
• Does the information on the signal converter nameplate agree with the operating data?
• Did you correctly install the device on the tank?
• Do the electrical connections agree with the national electrical codes?
5.2 Operating concept
You can read measurements and configure the device with:
• A digital display screen (optional).
• A connection to a system or PC with PACTware™. You can download the Device Type
Manager (DTM) file from the website. It is also supplied on the DVD-ROM delivered with the
device.
• A connection to a system or PC with AMS™. You can download the Device Description (DD)
file from the website. It is also supplied on the DVD-ROM delivered with the device.
• A connection to a HART
®
Field Communicator. You can download the Device Description (DD)
file from the website. It is also supplied on the DVD-ROM delivered with the device.
DANGER!
If the device has a Hazardous Locations approval, make sure that the device and the installation
agrees with the requirements of the certificate of compliance.