Siemens S5-135U/155U User Manual
Page 91
4-25
System Manual
C79000-G8576-C199-06
The power supply unit is delivered with the settings shown in bold print in
the following table.
Mark your chosen settings in the right-hand column and use this chart for the
subsequent implementation.
Function Selection
Jumper
Setting
Application/Note
(X)
Battery monitor
–
switched on for
rechargeable battery and battery
MM - NN
MA - NA
closed
closed
Redundant backup
–
switched on for battery and
off for rechargeable battery
MM - NN
MA - NA
closed
open
If, for example, no redundance is
required in backup, i.e. the rechargeable
battery is missing
–
switched off
MM - NN
MA - NA
open
irrelevant
For example, monitoring is not needed
for EU without backup
Reaction of battery monitoring
following battery failure
–
/BAU signal active following
return of line voltage
MB - NB
open
–
/BAU signal active following
return of line voltage and during
operation
MB - NB
closed
The possibility of evaluating the battery
monitoring during operation is
dependent on the CPU in use
After failure of more than one fan or
inadequate air flow
–
PSU shutdown
F-R
closed
–
No PSU shutdown
F-R
open
Caution: To prevent overheating of
modules, the PSU must be shut down
after 60 s at the latest (for example, by
time relay)
Voltage monitor
–
switched off
BA-EX
closed
Monitoring of load voltage input
switched off
–
switched on
BA-EX
open
Monitoring of load voltage input
switched on
Relay alarm
Fault message initiated by fan
f il
/
i hibi
i
b
–
driven by fan monitor and
output inhibit
BB-AA
closed
g
y
failure/output inhibit active; can be
signaled to control room, for example.
–
driven only by fan monitor
BB-AA
open
Fault message initiated by fan failure;
can be signaled to control room, for
example.
Establishing the
Jumper Settings
Central Controllers and Expansion Units Power Supply Units