SMA SI 3.0-11 User Manual
Page 80

10 Cleaning and Maintenance
SMA Solar Technology AG
80
SI30M-44M-60H-80H-BE-en-30
Operating Manual
12. Make the following settings for lead-acid batteries.
• Select the parameter BatVtgLst, set the battery voltage and confirm with Y.
• Select the parameter BatCpyNom, set the C10 capacity of the battery (see the Sunny Island inverter installation
manual for how to calculate the battery capacity) and confirm the battery capacity with Y.
13. Make the following settings for lithium-ion batteries.
• Select the parameter BatCpyNom, set the C10 capacity of the battery (see the Sunny Island inverter installation
manual for how to calculate the battery capacity) and confirm the battery capacity with Y.
14. Select the last page and confirm the question Setup New Battery with Y.