beautypg.com

9 general category (9xx) – SMA SI 3.0-11 User Manual

Page 68

background image

9  Troubleshooting

SMA Solar Technology AG

68

SI30M-44M-60H-80H-BE-en-30

Operating Manual

9.4.9 General Category (9xx)

W 887 Sic4ComLoss

1

Last communication with the

Sunny Island Charger 4 was

more than 24 hours ago.

Ensure that undamaged CAT5e cables

are used for communication and that the

cables are plugged in correctly.

Ensure that the configuration of the

Sunny Island Charger charge controller

with the DIP switches is correct.

Ensure that the communication interfaces

are correctly inserted in the Sunny Island.

W 890 BoxMeas

2

Disturbance in voltage or

current measurement at the

measurement point of the

Multicluster Box for the master.

Ensure that the control and measuring

cable between the Multicluster Box and

the corresponding Sunny Island of the

main cluster is correctly inserted. When

doing so, observe the correct sequence of

the Multicluster Box connections to the

Sunny Island inverters

(see the Sunny Island inverter installation

manual and the Multicluster Box

documentation).

W 891 BoxMeasSlv1

2

Disturbance in voltage or

current measurement at the

measurement point of the

Multicluster Box for slave 1.

W 892 BoxMeasSlv2

2

Disturbance in voltage or

current measurement at the

measurement point of the

Multicluster Box for slave 2.

No.

Name

Level Cause

F 905 CalFail

4

Unable to read calibration data.

F 906 CalFailSlv1

4

Unable to read calibration data of slave 1.

F 907 CalFailSlv2

4

Unable to read calibration data of slave 2.

W 915 TimeOut

1

An error has occurred in the program run sequence.

F 952 ExtBMSTimeout

3

Time for communication with the external battery management has been

exceeded.

W 953 WrnExtBMSTmOut 1

Time for communication with the external battery management has been

exceeded.

No.

Name

Level Cause

Corrective measures

This manual is related to the following products: