Preventive maintenance master schedule – Hypertherm HPR260 Manual Gas Preventive Maintenance Program Rev.5 User Manual
Page 199
MAINTENANCE
HPR260 Auto Gas
Instruction Manual
5-55
Preventive Maintenance Master Schedule
Daily:
• Verify proper inlet gas pressure.
• Verify proper gas flow settings. – Mandatory at every consumable change.
• Inspect torch and replace consumables as needed.
Weekly:
Week
Jan
Feb
March
April
May
June
July
Aug
Sept
Oct
Nov
Dec
1
2
3
4
5
Semi-Annually:
Year
1st Service
2nd Service
• Clean the power supply with dry, oil-free compressed air, or a vacuum cleaner.
• Verify cooling fans are working properly.
• Clean torch threads and current ring.
• Verify proper coolant level.
Annually:
Year
• Replace service parts per the Service Part Replacement Schedule.
• Replace service parts per the Service Part Replacement Schedule.
5
This manual is related to the following products: