beautypg.com

Preventive maintenance master schedule – Hypertherm HPR260 Manual Gas Preventive Maintenance Program Rev.5 User Manual

Page 199

background image

MAINTENANCE

HPR260 Auto Gas

Instruction Manual

5-55

Preventive Maintenance Master Schedule

Daily:

• Verify proper inlet gas pressure.

• Verify proper gas flow settings. – Mandatory at every consumable change.

• Inspect torch and replace consumables as needed.

Weekly:

Week

Jan

Feb

March

April

May

June

July

Aug

Sept

Oct

Nov

Dec

1

2

3

4

5

Semi-Annually:

Year

1st Service

2nd Service

• Clean the power supply with dry, oil-free compressed air, or a vacuum cleaner.

• Verify cooling fans are working properly.

• Clean torch threads and current ring.

• Verify proper coolant level.

Annually:

Year

• Replace service parts per the Service Part Replacement Schedule.

• Replace service parts per the Service Part Replacement Schedule.

5