beautypg.com

A.2.2 single-thread installation, A.2.2 – Comtech EF Data CSAT-5060 User Manual

Page 95

background image

C-Band Transceiver

Revision 1

CSAT-5060 5 to 25 Watt Installation

MN/CSAT5060.IOM

A–5

A.2.2

Single-Thread Installation














Step

Procedures

1

Place Unistrut bracket (1, Figure A-1) on a flat surface.

2

Slide springnuts (9) into the channel of the Unistrut bracket.

3

Fasten two pipe blocks (11) loosely to the springnuts using two bolts (6), two flat
washers (7), and two-split washer (8).














Figure A-3. Single- Thread

Installation

Figure A-4. Preparing the Pole

Bracket

IMPORTANT

Two RF Cables (TX/RX)

and a LNA are required for
installation.