beautypg.com

Appendix b. csat-5060 50-watt installation, B.1 unpacking and inspection, B.2 personnel – Comtech EF Data CSAT-5060 User Manual

Page 115: B.3 tools required

background image

B–1

Appendix B. CSAT-5060 50-Watt

INSTALLATION

IMPORTANT

Upon completion of installation, refer to Chapter 8

for LNA installation.

B.1

Unpacking and Inspection

Inspect the shipping container for damage:

• Retain shipping container and packing materials for possible re-shipment.

• Check to determine that all parts, materials and documentation have been shipped

with the converter.

• Inspect converter for possible damage, and then test for proper operation.

• If the shipment is incomplete, there is mechanical damage, or the converter does not

operate properly, notify the Comtech EF Data Customer Service representative
immediately.

If there is damage to the shipping container, notify the carrier, and retain all shipping
materials for inspection by the carrier.

B.2 Personnel

Comtech EF Data recommends that two technicians perform any of the following
installations.

B.3

Tools

Required

The following tools are recommended for unit installation.

Qty.

Description

1

1

Adjustable wrench
Alternate: Set of various box wrenches
Tin Snips