beautypg.com

Appendix c. csat-5060 100w or 125w installation, C.1 unpacking and inspection, C.2 man-power – Comtech EF Data CSAT-5060 User Manual

Page 139

background image

C–1

Appendix C. CSAT-5060 100W or 125W

INSTALLATION

IMPORTANT

Upon completion of installation, refer to Chapter 8

for LNA installation.

C.1

Unpacking and Inspection

Inspect the shipping container for damage:

1. Retain shipping container and packing materials for possible re-shipment.

2. Check to determine that all parts, materials and documentation have been

shipped with the converter.


3. Inspect converter for possible damage, and then test for proper operation.

• Notify the Comtech EF Data Customer Service representative immediately

if the shipment is incomplete, or there is mechanical damage, or the
converter does not operate properly.

• Notify the carrier, and retain all shipping materials for inspection by the

carrier, if there is damage to the shipping container.

C.2 Man-Power

Comtech EF Data recommends that two technicians perform any of the following
installations.