beautypg.com

3 assemble lna switch kit, as/0438 – Comtech EF Data CSAT-5060 User Manual

Page 81

background image

C-Band Transceiver

Revision 1

LNA Installation

MN/CSAT5060.IOM

8–5

8.1.3

Assemble LNA Switch Kit, AS/0438


Step

Procedures

1

Remove all protective tape from switch and keep it clean.

2

Position Low Noise Amplifiers (LNAs) and gasket (11, Figure
2-1) on Port 1 and Port 3 of switch (5).

3

Secure each LNA with eight bolts (7, Figure 2-1), lock washers
(8) and flat washers (12).

4

Position adapter (3) and gasket (11) on Port 2 and secure with 10
bolts (7), lock washers (8), and flat washers (12).

5

Place termination (10) on threaded part of adapter (3)

IMPORTANT

Ensure that the OUTPUT flange of the filter is against switch
(5). TRF filter is Customer-Selectable at time of ordering.

6

Position customer-select TRF filter, gasket (11), and support
bracket (1, Figure 2-2) on Port 4 of switch (5, Figure 2-1) and
secure with eight bolts (3, Figure 2-2), lockwashers (2), and flat
washers (1), and use two bolts (7, Figure 2-1), lockwashers (8),
and flat washers (12).

7

Set assembly aside for later installation.








Port 4

Port 1
LNA-B

Port 2

Port 3
LNA-A

Figure 8-4. Switch Port Locations