CSAT-5060 50 Watt Installation
MN/CSAT5060.IOM
B–20
Step
Procedures
16
Slide eight springnuts into channel of the Unistrut bracket (1, figure B-1).
17
Repeat procedure for second Unistrut bracket (1).
18
Install bracket (1, figure B-9) and secure to Unistruts with four bolts (7) and
flat washers (2).
19
Ensure that the bracket is centered on the Unistruts.
20 Tighten
hardware.
IMPORTANT
When installed, ensure the CSAT 50 Watt unit fan is facing outward
21
Install brackets (1, Figure B-2) and secure to Unistrut brackets with four
bolts (6), flat washers (2) and split lock washers (3). Refer to Figure B-6 for
proper orientation.
22
See Figure B-25. Position brackets (1) against center bracket. DO NOT
tighten hardware at this time.
23
Install four bolts (5, Figure B-2) with split washers (3) , and flat washers (2)
into provided mounting holes in the CSAT 50 Watt casting.
24
Carefully lift the unit, and slide the bolt head into the groove of bracket
(Figure B-6).
25
Ensure the washers are between the unit and the bracket
26
Do not tighten hardware at this time.
27
Temporarily install the assembled waveguide switch (See Figures B-20 for
location and orientation).
28
Ensure that the ports line-up and can be secured. If a gap is present, adjust
by sliding the unit and brackets on the Unistrut (In or Out).
29 Tighten
hardware.
30
Install the assembled waveguide switch (Figure B-20) and waveguide
gaskets.
31
Secure assembly with bolts, lock washers and flat washers from hardware
kits supplied with each CSAT unit (not shown, PN AS/0402-2).