Hardware Preparation and Installation
ATCA-7370/ATCA-7370-S Installation and Use (6806800P54H)
61
When the blade is completely installed, the blue LED starts to blink. This indicates
that the blade has signified its presence to the shelf management controller.
6. Wait until the blue LED is switched off, then fasten the faceplate screws, which
secure the blade to the shelf.
When the blue LED is switched OFF and the green LED (IS) is switched ON,
this indicates that the payload has been powered up and the blade is active.
7. Connect cables to the faceplate, if applicable.
2.5.2
Removing the Blade
This section describes how to remove the blade from an AdvancedTCA system.
If an RTM is connected to the front blade, make sure that the handles of both the RTM and
the front blade are closed in order to power up the blade’s payload.
Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage circuits or
shorten their life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.
Blade Malfunctioning
Incorrect blade installation and removal can result in blade malfunctioning.
When plugging the blade in or removing it, do not press on the faceplate but use the
handles.