AMETEK Lx Series II User Manual
Page 200
User Manual
Lx / Ls Series II
196
TVF 501 Tests
Starting operations are not applicable to AC Utilization Equipment.
TVF 601 Tests
– Revision F
TVF601
Power Failure - One Phase
– Rev F
Condition
Duration (s)
Run at 400, Repeat at 360, 600 and 800 Hz
A
100 msec
52
B
500 msec
54
C
3 sec
66
D
7 sec
86
TVF 602 Tests
– Revision F
TVF601
Power Failure
– One, Two Phase – Rev F
Condition
Duration (s)
Run at 400, Repeat at 360, 600 and 800 Hz
One Phase
A
Phase A, 7 sec - 5x
86
B
Phase B, 7 sec - 5x
86
C
Phase C, 7 sec - 5x
86
D
Phase A, 30 min - 1x
1800
E
Phase B, 30 min - 1x
1800
F
Phase C, 30 min - 1x
1800
Two Phase
G
Phase A&B, 7 sec - 5x
86
H
Phase B&C, 7 sec - 5x
86
I
Phase A&B, 30 min - 1x
1800
J
Phase B&C, 30 min - 1x
1800
TVF 603 Tests
– Revision F
TVF603
Power Failure
– Phase Reversal – Rev F
Condition
Duration (s)
Run at 400, Repeat at 360, 600 and 800 Hz
A
Phase rotation C-B-A
1800
Phase rotation A-B-C
1800