9 initiation and test, 1 before connecting the device, 2 after connecting the device – Kipp&Zonen COMBILOG Data Logger User Manual
Page 85: 3 configuration of the data logger, Initiation and test
9
INITIATION AND TEST
9.1
Before Connecting the Device
Before connecting the supply voltage to the data logger
COMBILOG 1022, once again check all connections. Watch
that the supply voltage never exceeds 30 VDC.
9.2
After Connecting the Device
After connecting the supply voltage the data logger displays the
current operating state on the two LEDs at the front of the
device (if the LED-display has not been switched off). The
meanings of the LEDs are given in table 9.1 on the following
page.
If the module was switched off for a longer time, the settings of
date and time should be checked and corrected if necessary
(see chapter 6.2).
9.3
Configuration of the Data Logger
Before entering into operation the data logger has to be pro-
grammed and configured as to its specific application. In most
cases the programming has already been carried out on deliv-
ery (see status of RUN-LED and ERR-LED, table 9.1). The
configuration has to be carried out by the user by means of the
configuration software COMBILOG.EXE on a PC. The installa-
tion procedure is described in APPENDIX E.
Hardware Manual COMBILOG 1022
85