beautypg.com

Reznor SHH (Indoor PreevA) Unit Installation Manual User Manual

Page 2

background image

Form I-PDH/SDH/PEH/SHH/PXH, Page 2

1.0 General

1.2 Hazard Labels and Notices

There are warning labels on the unit and throughout this manual. For your safety, read

the definitions below and comply with all boxes labeled

CAUTION, WARNING, and

DANGER during installation, operation, maintenance, and service of this heater.

Definitions of Hazard Intensity Levels in this Manual

HAZARD INTENSITY LEVELS

1. DANGER: Failure to comply will result in severe personal injury or death

and/or property damage.

2. WARNING: Failure to comply could result in severe personal injury or

death and/or property damage.

3. CAUTION: Failure to comply could result in minor personal injury and/or

property damage.

WARNING

Installation should be done by a qualified agency in

accordance with these instructions. The qualified service

agency installing this unit heater is responsible for the

installation.

1.0 General.............................................................. 2

1.1 Application .........................................................................2
1.2 Hazard Labels and Notices ...............................................2
1.3 General Installation Information .........................................3
1.4 Warranty ............................................................................4
1.5 Installation Codes ..............................................................4

2.0 Location ............................................................ 5
3.0 Receiving, Moving, Uncrating, and Preparing

for Installation .................................................. 5

4.0 Dimensions and Clearances ........................... 7

4.1 Clearances .......................................................................7
4.2 Configurations and Dimensions .........................................8

5.0 Suspension

and Mounting ................................................ 10

5.2 Lifting and Suspension ...................................................10
5.1 Weights ...........................................................................10
5.3 Mounting .........................................................................12

6.0 Mechanical...................................................... 13

6.1 Gas Heat Section Piping and Pressure - Models PDH, SDH,

and SHH ..........................................................................13

6.2 Gas Heat Section Condensate Drain(s) ..........................19
6.3 Combustion Air Requirements - Model PDH ...................21
6.4 Unit Inlet Air (Supply Air) .................................................22
6.5 Optional Evaporative Cooling Module (factory installed) -

Models PDH, SDH, SHH, PEH, and PXH .......................29

6.6 Cooling Module - Option AU on PDH, SDH, PEH, SHH, and

PXH .................................................................................33

6.7 Unit Discharge ................................................................36
6.8 Blowers, Belts, and Drives ..............................................42

7.0 Electrical Supply and Wiring ....................... 43

7.2 Supply Wiring .................................................................43
7.1 General ...........................................................................43
7.3 Wiring Diagram and Unit Wiring Requirements ..............45
7.4 Control Wiring ..................................................................45
7.5 Electrical Operating Components ....................................47
7.6 Other Optional Electrical Components ............................49

8.0 Controls and Operation ................................. 51

8.1 Gas Controls - apply to Models PDH, SDH, and SHH ....51
8.2 Analog Controls for Heating or Heating/Makeup Air .......51
8.3 Digital Controls for Heating/Cooling, Makeup Air and

Dehumidification .............................................................53

8.4 Ignition System - Models PDH, SDH, and SHH ..............59

9.0 Commissioning and Startup ........................ 62

9.2 Checklist Prior to Startup ................................................62
9.1 General ............................................................................62
9.3 Startup Checklist and Warnings .....................................63

APPENDIX............................................................. 67

STARTUP FORM ...................................................................67
Wiring Diagram Option Identification .....................................68
Pressure/Temperature Chart for Checking Superheat &

Subcooling.......................................................................69

Index...................................................................... 71
INSTALLATION RECORD - to be completed by the

installer: .......................................................... 72

1.1 Application

The information in this manual applies to all Reznor

®

PREEVA

®

Indoor Models includ-

ing the high efficiency Model SHH. Each model has unique features. Please read care-

fully to be sure of what applies to the model being installed.

Contents