beautypg.com

Temporarily fastening the rails, Fixing rail f and rail r – Toshiba Magnia Z500 User Manual

Page 75

background image

Installing and Removing Hardware

Removing and replacing the server panels

56

2 Temporarily fasten Rail R to the posts on the left and right of

the rack rear, and Rail F (L) and Rail F (R) to the posts on the
left and right at the front with Screws (M6).

Temporarily fastening the Rails

3 Fix Rail R on the left and right, Rail F (L) and Rail F (R) with

two Screws (M5).

Fixing Rail F and Rail R

Rail F WD (L)

Screws (M6)

Rail R

Screws (M5)