beautypg.com

8 attach the server panels to the server, 9 connect the peripheral units and switch them on – Toshiba Magnia Z500 User Manual

Page 70

background image

Installing and Removing Hardware

Before starting operation

51

8 Attach the server panels to the server.

In case of the Rack Type, fit the panels to the server before
mounting it on the rack.

9 Connect the peripheral units and switch them on.

10 Plug the server's power cable connector into an AC outlet (or

UPS) and then switch on the server.

Some optional devices need to be setup with jumper switches
and DIP switches.
See “BIOS setup utility” on page 45.