beautypg.com

Introduction – AT&T System 25 User Manual

Page 23

background image

INTRODUCTION

INTRODUCTION

This manual provides procedures and information for installing, and testing the
AT&T System 25 Release 3 and associated equipment. The maintenance
information contained in Section 4 pertains to the AT&T System 25 Release 1,
Versions 1 and 2 (RI VI and R1V2), Release 2, Version 1 (R2V1 ), as well as to
AT&T System 25 Release 3, Version 1,2 and 3 (R3V1, R3V2 and R3V3).

Installation and maintenance procedures for the AT&T System 25 Call

Management System and Integrated Solution are provided in a separate set of
documents for each system.

This manual is intended for use by an installation and/or maintenance technician

dispatched to a System 25 site for an installation or in response to an alarm or a
user trouble report. This technician must have completed the Tier 1 training

course (T-335). Each installed System 25 has a customer-designated System
Administrator. The technician

should work closely with this System

Administrator. The System 25 Administration (555-540-500) and Implementation

(555-540-650) Manuals describe the administrator’s functions.

In the S25 documentation, the terms “voice terminal”, “voice stations”, and

“telephone” are used to describe the same piece of hardware. The S25
documentation also uses the terms ‘Personal Dial Code (PD.)”, and ‘extension

number’ interchangeably.

The remainder of this manual is divided into Sections 2 through 6 and six
appendices:

Section 2. Installation-Describes the installation of the cabinet(s)
wiring, and other components. Certain preinstallation requirements

must be met; therefore, read “PREINSTALLATION REQUIREMENTS”

before installing any part of System 25.

Section 3. System Test—Describes all the tests necessary to verify

that the system is operating correctly.

Section 4. Maintenance —

Provides information necessary for

monitoring, testing, and maintaining all releases of AT&T System 25.

November 1995

1-1