4. Commissioning
4−46
Festo P.BE−SPC200−COM−PDP−E N en 0901c
Wait
ţ 10 s
Initialization
phase
Switch on the operating
voltage and the load voltĆ
age supplies at the same
time
Set ENABLE
Switch on the load voltage
Wait
ţ 1 s
Creating readiness to operate
Wait
ţ 10 s
Reset:
−ăENABLE,
−ăSTOP,
−ăRESET or START/RESET
Switch on the operating
voltage supply
1
Switch on operating
and load voltage
supplies
together?
Yes
No
1
2
2
2
1
Operating and load voltage supplies of the SPC200
2
There must be a stable supply of voltage: 24 V DC −5 %/+25 %
Fig. 4/15: Creating readiness to operate