4. Commissioning

4−46

Festo P.BE−SPC200−COM−PDP−E N en 0901c

Wait

ţ 10 s

Initialization
phase

Switch on the operating
voltage and the load voltĆ
age supplies at the same
time

Set ENABLE

Switch on the load voltage

Wait

ţ 1 s

Creating readiness to operate

Wait

ţ 10 s

Reset:
−ăENABLE,
−ăSTOP,
−ăRESET or START/RESET

Switch on the operating
voltage supply

1

Switch on operating

and load voltage

supplies

together?

Yes

No

1

2

2

2

1

Operating and load voltage supplies of the SPC200

2

There must be a stable supply of voltage: 24 V DC −5 %/+25 %

Fig. 4/15: Creating readiness to operate