4. Commissioning
4−45
Festo P.BE−SPC200−COM−PDP−E N en 0901c
The following signals must be present at the controller inputs
before the readiness to operate can be created:
Record Select mode
Controller input
Signal
ENABLE
0−signal
1)
STOP
0−signal
RESET
0−signal
CLK_B
Not relevant
CLK_A
Not relevant
1)
Observe the instructions on enabling the controller in section 4.1.
Start/Stop mode
Controller input
Signal
ENABLE
0−signal
1)
STOP
0−signal
START/RESET
0−signal
SYNC_IB
Not relevant
SYNC_IA
Not relevant
1)
Observe the instructions on enabling the controller in section 4.1.