Festo Кабели и принадлежности User Manual
Page 50
4. Commissioning
4−4
Festo P.BE−SPC200−COM−PDP−E N en 0901c
4.1.1 Supplementary instructions on commissioning with WinPISA
Start commissioning as described in the WinPISA manual (see
chapter 4 in the WinPISA manual). With some commissioning
steps, the signals ENABLE, START and STOP are required for
controlling the axes. For example with the steps:
ć
movement test
ć
identification travel
ć
test and start program.
If a field bus module is installed, you can generate these conĆ
trol signals during commissioning in the test mode. CommisĆ
sioning can then be carried out independently of the field
bus.
Activate the test mode
Caution
You can specify input signals in the test mode. The actual
input signals will be ignored. The test mode is usually used
for commissioning, if the SPC200 is
not connected with the
field bus or is
not online. Activate the test mode only if:
S you are familiar with the effect of the signals which are
thus influenced.
Warning
Make sure that nobody can place his/her hand in the
positioning range of the moveable mass and that no
objects lie in its path.