Start-up, 1 operator control of the signal converter – KROHNE OPTIMASS with MFC 300 EN User Manual
Page 99
99
OPTIMASS
10
START-UP
Before connecting to the power supply, check that the system has been correctly installed in
accordance with the relevant sections
The flowmeter, comprising sensor and signal converter, is delivered in a ready-to-operate con-
dition. All operating data have been factory-set according to your order specifications and ref-
erence should be made to the report on settings which is supplied.
After switching on the power, a self-test is carried out, after which the flowmeter immediately
starts flow measurements and displays the current measured values.
Alternating between the 1st and 2nd measured value window and, if provided, the list of status
messages is carried out by actuating key
or
Possible status messages, their meaning and
possible cause are listed in the Status Table in section 10.5
10.1 Operator Control of the Signal Converter
Display, operating and control elements
3
5
6
9
4
7
1
2
8
1
Blue bar indicates:
The tag number.in the measuring mode
The menu/ function name in the setting mode
2
‘X’ indicates actuation of a key
indicates IR transmission in operation; the 4 optical keys then have no function
3
Graphics display, backlit (white)
4
Optical interface for wireless transfer of data (input / output)
5
Socket for connection to the KROHNE GDC bus
6
Optical keys for operating the signal converter without opening the housing
7
3rd display line, shown here as bar graph
8
1st and 2nd display line to indicate different measured variables
Shown here in large format for only one measured variable
9
signals a status message in the status list