Connectng the nput wres n parallel wth other devces can cause sgnal
degradaton, affectng all connected devces. If you have to make a parallel
connecton, then
• Turn the burnout detection function OFF.
• Ground the instruments to the same point.
• Do not turn other instruments ON or OFF during operation. This can have adverse

effects on the other instruments.

• Do not connect RTDs in parallel.

Wrng Procedure

There is a terminal cover screwed onto the signal input terminal block on the rear panel.
It has a label indicating the terminal arrangement on it.

1.

Turn the MV OFF and remove the terminal cover.

2.

Connect the signal wires to the terminals.

R

ecommended torque for

tightening the screws

Screw terminals

0.9 to 1.0 N•m

Clampted terminals 0.22 to 0.25 N•m

3.

Replace the terminal cover and fasten it with screws. The appropriate tightening

torque for the screws is 0.6N•m.

Note

It may be difficult to firmly secure input signal wires with diameters of 0.3 mm or less to clamp
terminals. To secure the wires, try folding the conductive parts over when you connect them to
the clamp terminal.

Input Termnal Arrangement

Locaton of the Input Termnal Blocks

• MV1000

Input terminal block 2

Input terminal block 1

• MV2000

Input terminal block 1

Input terminal block 2

Input terminal block 3

Input terminal block 4

2.2 Sgnal Input Termnal Wrng

This manual is related to the following products: