Yokogawa Integral Oxygen Analyzer ZR202 User Manual
Page 4

ii
IM 11M12A01-02E
8th Edition : Jan.13,2012-00
This manual consists of twelve chapters. Please refer to the reference chapters for installation,
operation and maintenance.
Table of Contents
T-Int2E.ai
: Read and completely understand before operating the equipment.
: Read before operating the equipment, and refer to it whenever necessary.
: Recommended to read it at least once.
1. Overview
2. Specifications
3. Installation
4. Piping
5. Wiring
6. Components
7. Startup
8. Detailed Data Setting
9. Calibration
10. Other Functions
11. Inspection and
Maintenance
12. Troubleshooting
CMPL (parts list)
Chapter
Outline
Installation
Maintenance
Operation
Relates to
Equipment models and system configuration
examples
Standard specification, model code (or part
number), dimension drawing for each equipment
Installation method for each equipment
Examples of piping in three standard system
configurations
Wiring procedures such as “Power supply wiring”,
“output signal wiring” or others
Major parts and function are described in this
manual
Basic procedure to start operation of EXAxt ZR.
Chapter 7 enables you to operate the equipment
immediately.
Details of key operations and displays
Describes the calibration procedure required in
the course of operation.
Other functions described
How to conduct maintenance of EXAxt ZR and
procedures for replacement of deteriorated parts
This chapter describes measures to be taken
when an abnormal condition occurs.
User replaceable parts list