Teledyne LeCroy SAS Suite User Manual User Manual

Page 102

background image

Version 6.25

SASSuite User Manual

92

LeCroy Corporation

There can be up to 255 events linked together into a sequence. Only one sequence can
be created.

When two or more events have been moved into a Sequence cell, they can be linked into
a sequence by assigning the action Advance the sequence to events in the chain. The
last event in a sequence is then usually assigned the action Trigger.

There are two ways to assign an action to an event button:

Right-click on an event button and select Specify Action from the pop-up
menu.

Double-click on the event button and then select an action from the
Properties dialog box.

Assigning an Action from the Pop-up Menu

To assign an action to an event button via the pop-up menu,

Step 1 Right-click on the button. A pop-up menu appears:

Step 2 Select Specify Action and then an action from the sub-menu. The

menu closes and the action is assigned.