Chapter 4 equipment list, Module/installation hardware – NEC NEAX NDA-24349 User Manual
Page 77
![background image](/manuals/193093/77/background.png)
NEAX2000 IPS
Request For Proposal (RFP) Reference Guide
Page 4-1
NDA-24349 Issue 4
Chapter 4 Equipment List
Module/Installation Hardware
This table shows the names and functions of the modules
.
Equipment Name
Function Name
Remarks
SN1617 PIMMD
PIM
Port Interface Module (PIM)
Maximum 64 physical ports per PIM. Houses two batteries for
protection from short power interruption (for 30 minutes).
At maximum configuration, the system consists of eight PIMs,
and provides a total of 512 physical ports (64 ports × 8).
SN1568 PIMMF
PIM
Port Interface Module (PIM) for Backup CPU System
Maximum 64 physical ports per PIM.
Houses two batteries for protection from short power
interruption (for 30 minutes).
One PIM is required per Backup CPU System.
COVER PARTS
ASSEM-A
COVER PARTS
ASSEM
Cover Parts Assembly
One cover parts assembly is required for each PIM.
SN1545
BASE
BASE/TOP
ASSEM
Base/Top Cover Assembly
One base and top cover assembly is required for each stack.
SN1619
BATTMB
BATTM
Battery Module for housing PIM or CS (ZT) backup batteries
Houses two pairs of batteries for protection from long power
interruption (for 3 hours).