IBM SG24-4817-00 User Manual
IBM Computer Accessories
Table of contents
Document Outline
- IBM ATM Workgroup Solutions:
- Implementing the 8285 ATM Switch
- Contents
- Figures
- Tables
- Preface
- Chapter 1. Introduction to ATM Networks
- Chapter 2. Introduction to the IBM 8285 Nways ATM Workgroup Switch
- Chapter 3. Functional Overview of the IBM 8285
- Chapter 4. IBM 8285 ATM Modules
- Modules Currently Available for the 8285 ATM Subsystem
- Some Common Elements among the 8285 Modules
- Maximum Capacity
- Variable VPC/ VCC Value Ranges
- ATM 12- Port 25 Mbps UTP Concentrator Module
- Sample Scenarios
- ATM 2- Port 155 Mbps Flexible Media Module and ATM 3- Port 155 Mbps
- LAN Concentration Module
- Differences between the 2- and 3- Port ATM Modules
- ATM 155 Mbps Media Module Traffic Management
- Sample Scenarios
- ATM 4- Port 100 Mbps MIC Fiber Module and the ATM 4- Port 100 Mbps SC
- Fiber Module
- Sample Scenarios
- Video Distribution Module
- MPEG Fundamentals
- Configuring the Video Distribution Module
- Sample Scenarios
- ATM 4- Port TR/ Ethernet Bridge Module
- Sample Configurations Using ATM TR/ Ethernet Bridge Module
- ATM TR/ Ethernet Bridge Module and LAN Emulation
- Association between IP and MAC Address
- ATM TR/ Ethernet Bridge Module Configuration Utility Program
- Running and Stored Configuration Parameters
- ATM WAN Module
- A02 WAN ATM Physical Interface Supported
- VPD Installation Considerations
- Sample Scenario
- LAN Switching Modules
- Description
- Sample Scenarios
- Chapter 5. 8285 ATM Network Specifications
- ATM Connections
- Supported VPI and VCI Range
- Supported Virtual Connection Types
- Maximum Number of Connections Supported
- How PVCs Are Supported
- How to Configure PVCs
- How PVPs Are Supported
- How to Define PVPs
- How a VPI/ VCI Is Allocated to SVCs
- How Point- to- Multipoint Connections Are Supported
- 8285 LAN Emulation Specifications
- Traffic Management
- Service Classes Supported by the IBM 8285 ATM Workgroup
- Chapter 6. IBM 8285 Planning and Installing
- Physical Planning
- Packaging
- Physical Specifications
- ATM Ports and Cabling
- Planning for Availability
- Logical Planning
- Capacity Planning
- Standards Compliances
- Install
- Physical Installation
- 8285 Console
- ATM Concentration Module Basic Configuration Process Steps
- Microcode/ Picocode Considerations
- Reasons for Upgrading Microcode
- Acquiring the Latest Microcode
- Upgrading the Microcode
- Chapter 7. IBM 8285 Configuration
- Configuring Classical IP
- Classical IP Parameters
- Configuring a Simple CIP Network
- Troubleshooting Your CIP Network
- Configuring a Local Multi- Switch Network for CIP
- Configuring LAN Emulation
- 8285 LAN Emulation Functions Overview
- LAN Emulation Parameters
- Configuring a Simple LANE Network
- Troubleshooting Your LANE Network
- Chapter 8. IBM 8285 Management
- Management Information Bases (MIBs)
- IBM Nways Campus Manager ATM Overview
- IBM Nways Campus Manager ATM for AIX
- Overview
- Prerequisites
- Using Nways Campus Manager ATM for AIX with IBM 8285
- IBM 8285 Node Related Information
- Nways Manager for Windows
- Overview
- Prerequisites
- Using Nways Manager for Windows with IBM 8285
- Appendix A. 8285 ATM Control Point Commands
- Appendix B. Pinouts for Ports and Cables
- Appendix C. Part Numbers for Key Components
- Appendix D. Hints and Tips for the ATM 4-Port TR/Ethernet Bridge Module
- Appendix E. IBM ATM Campus Switch Private MIBs
- Appendix F. Special Notices
- Appendix G. Related Publications
- How To Get ITSO Redbooks
- Glossary
- List of Abbreviations
- Index
- Numerics