8.9
Starting after First Commissioning
Once all parameters have been set, the Sunny Island 3324/4248 can be put into
operation.
Make sure that the message "To start press
pressing an arrow key until the "To start press
Press
A single beep will be heard.
The green LED on the control panel of the Sunny Island 3324/4248 will illuminate.
Once successfully started, a status overview
message appears in the display, showing the
current operating mode and the output power
(see also figure below):
To start
press
[¿¿¿¿¿¿_______]
Invert oo
[¿¿¿¿¿¿¿¿¿¿¿¿ ]
>Invert L oo E
Output power/charging power
Direction of energy
Load shedding relay
Generator status
Generator control
relay
Fault display
Operating mode
Load status