4 scope of delivery, 5 required tools and resources, Scope of delivery – SMA SI 3324 Installation User Manual
Page 15: Required tools and resources

SMA
Technologie AG
The Sunny Island 3324/4248
Installation Guide
SI3324/4248-14:SE2406
Page 15
2.4
Scope of Delivery
The following elements are included:
• 1 Sunny Island 3324/4248 with housing cover (not fastened)
• 1 wall bracket
• 1 battery temperature sensor
• 5 cable feed-throughs M25
• 5 nuts M25
• 1 double-hole insert for cable feed-throughs M25
• 4 cable feed-throughs M20
• 4 nuts M20
• 4 double-hole inserts for cable feed-throughs M20 (2 x 6 mm)
• 1 cable feed-through M12
• 1 nut M12
• 4 housing cover screws
• 1 screw for joining the angle bracket to the wall bracket
• 1 installation manual and 1 user manual
• 1 safety instructions (multilingual)
• 1 "Guarantee and Warranty Conditions" form
2.5
Required tools and resources
The following tools are recommended for mounting and installing the Sunny Island
3324/4248:
Installation of the Sunny Island 3324/4248 wall bracket:
1
drill
1
suitable drill (e.g. stone drill), Ø 8 mm
3
wall anchors for the wall bracket (e.g. SX 8)
3
hexagon bolts, 6x50 mm, washers
1
spirit level
refer to the "Installation" section for any further tools required
Installation of the Sunny Island 3324/4248:
1
stripping pliers
cable end sleeves
1
digital multimeter