Commissioning

SMA

Technologie AG

Page 66

SI3324/4248-14:SE2406

Installation Guide

8.2

Initialization

The initialization sequence of the Sunny Island 3324/4248 only occurs when the
Sunny Island 3324/4248 is switched on for the first time. For this, the installation must
be completely finished (see section 5 "Electrical Connection" (Page 31)).

Keep to the following sequence when initializing the Sunny Island 3324/4248. This
describes the initialization sequence and provides notes on how the necessary
parameter settings are to be performed.

1.

Ensure that the the loads are not yet
connected.

2.

Switch on the Sunny Island 3324/4248 by
switching the DC circuit breaker to the "ON"
position.

3.

The "SMA" greeting appears in the display.

4.

The type of your Sunny Island 3324/4248 is
then displayed.

5.

On the first commissioning, the display then
shows "Init".

First commissioning may only be performed by suitable qualified
personnel (electricians).

Never remove the battery cables during operation. Always switch
off the Sunny Island 3324/4248 first. There is a risk of injury due
to arcing and electric shock. Use a separate load disconnecting
switch (directly at the batteries) for disconnecting the Sunny Island
3324/4248.

Init

SMA SMA SMA SMA

SI4248