beautypg.com

SMA SI 3324 Installation User Manual

Page 139

background image

SMA

Technologie AG

Menu Structure and Parameter Lists

Installation Guide

SI3324/4248-14:SE2406

Page 139

24-10

Transition
(B)

Ramp
Fast

Fast

Manner in which the Sunny Island 3324/
4248 switches from charging to inverter
operation if a grid or generator fault is
detected.
If problems occur when operating with
Sunny Boys, then select the "Ramp" option
here.

24-11

PGenRevers
(B)

0 to 1000 W

300

Maximum permissible generator reverse
power

24-12

PGenActiv
(B)

ON
OFF

OFF

Activation of the load-dependent
generator request (parameters 24-13 to
24-16 are activated)

24-13

PGenTAve
(B)

1 to 60 min

5

Average time after which the generator is
switched on or off (depending on "24-15
PGenOn" and the Sunny Island 3324/
4248 output power, see "11-4
PacInverter")

24-14

PGenTRun
(B)

1 to 60 min

10

Minimum generator run time
(independent of the Sunny Island 3324/
4248 output power, see "11-4
PacInverter"), after it has been switched
on as a result of a load-dependent
generator request. Once the minimum run
time has expired, the generator is again
switched according to the value of
parameter "24-13 PGenTAve".

24-15

PGenOn
(B)

1000 to 6000 W

3500

Output power at which the generator is
connected (connection time depends on
the "24-13 PGenTAve" parameter)

24-16

PGenOff
(B)

1 to 99 %

80

Output power "11-4 PacInverter" relative
to "24-15 PGenOn" at which the
generator is switched off (the average
value of output power in percent
according to the "24-14 PGenTRun"
parameter)

No.

Name

Range/
unit

Default

Description