SMA

Technologie AG

Battery Management

Installation Guide

SI3324/4248-14:SE2406

Page 103

Sunny Island 3324/4248 remains in this phase until either more than 30 % of the
nominal capacity has been used (all discharges are summed) or the generator is
automatically restarted (see section 8.5 "Operation with a Generator" (Page 74)).

This means that the battery charging voltage remains below the value set under the
parameter "23-12 VchargeFloat" during this time, if (e.g.) further charging via Sunny
Boys or a public grid is possible. The purpose of the float charge is to keep the
batteries in a fully charged state without causing premature aging through
overcharging.

For the second charging level V

0

, the constant voltage charging (absorption phase)

for a limited period of time, the Sunny Island 3324/4248 automatically chooses
between three different voltages and charging times. These are the boost charge, full
charge and equalizing charge. The following figure shows a process diagram of the
charging process.

The Sunny Island 3324/4248 most often chooses the boost charge in order to bring
the batteries to a reasonable level in a short period of time. This process is optimized
to keep the generator run times as short as possible.

Boost Charge

V = VchargeBoost

Full Charge

V = VchargeFull

Equaliziation

V = VchargeEqual

Floating Charge

V = VchargeFloat

Silent Mode

Bms Silent Request = on

TcycleEquals days or 30

charging throughputs

TcycleFull days or

8 charging throughputs

V > VchargeFull

for TabsorbFull

V > VchargeEqual

for TabsorbEqual

TcycleEquals days or 16

charging throughputs