SMA SI 3324 Installation User Manual
Page 110
Battery Management
SMA
Technologie AG
Page 110
SI3324/4248-14:SE2406
Installation Guide
Set the parameters 23-2, 23-3 and 23-4, one after the other. The exact sequence is
described in section 8.2 "Initialization" (S. 66), points 8—21.
5.
Now set the battery type ("23-2 BatType"
parameter).
6.
Press the arrow key (↓) to access the
parameter for setting the battery capacity in
ampere hours ("23-3 AmpHoursBat"
parameter).
7.
Press the arrow key (↓) to reach the
parameter for setting the maximum battery
charging current ("23-4 AmpdcBatMax"
parameter) (see section 8.1 "Preparation"
(Page 63)).
8.
Press
9.
The message "To start press
displayed. The Sunny Island 3324/4248 is
now ready to start.
Parameter information is also provided in section 17.2.2 "Adjustable System
Parameters" (Page 134).
BatType ‹23
VRLA
↵
AmpHoursBat ‹23
100 Ah
↵
AmpdcBatMax ‹23
10 A
↵
To start
press